GN3 INSPECTION AND TESTING PDF

17 items The tragedy of the Grenfell Tower fire highlighted the deep issues faced by social housing in the UK and sparked an outcry of discussion. In particular. 12 Oct Guidance Note 3 Inspection & Testing 17th I EE Wiring Regulations Seventeenth Edition BS Requirements for Electrical. 8 Nov Hi I am newbie at the Testing and Inspection of Electrical systems. I have bought lots of books including: OSG, IEE, GN3, and Testing of.

Author: Tezil Gardarisar
Country: Luxembourg
Language: English (Spanish)
Genre: Science
Published (Last): 11 July 2011
Pages: 127
PDF File Size: 14.7 Mb
ePub File Size: 10.25 Mb
ISBN: 132-3-42627-916-1
Downloads: 9096
Price: Free* [*Free Regsitration Required]
Uploader: Kigarg

Earth fault loop impedance 4.

GN3 Inspection & Testing Smaller

If the results obta ned are significantly different, the above procedure should be repeated w i t h test electrode T1 placed further from the electrode under test. I have a problem in working out what equipment e. Aspects affecting in-service reading accuracy include the effects of temporary spike resistance, interference currents and the layout of the test elecfodes The instrument should carry some facility to check that the resistance to earth of the temporary potential and current spikes are within the operating limits of the instrument.

The forms comprise the following: This should contain any information relating to the project which is likely to be needed during any subsequent construction work to ensure the health and sa’ety of persons.

Only in a Schedule of Test Results associated with a Periodic Inspection Report is it acceptable to record incorrect polarity. It is stressed that it is essential to establish which Statutory and other Regulations apply and to install accordingly.

I know it can be a bit daunting at first if you are unsure, but GN3 does tell you all you need to inspeection so stick with it. GuestNov 8, Have you thought about doing the or courses??? These characteristics s h o j l d also be available for safety services such as UPS and generators.

Switchgear 1 2 3 4 inzpection 6 7 8 9 Suitable for the purpose intended Ch. Some Guidance Notes also contain material not included in BS This form is intended for such work as the addition of xnd socket-outlet or lighting point to an existing circuit, or for repair or modification.

In fact you should barely be aware of him unless he asks you a question or you need to ask him something.

GN3 Inspection & Testing Smaller

A ‘Periodic Inspection Report’ should be issued for such a oeriodic inspection. A duplicate should be retained by the contractor.

This Section makes recommendations inspcetion the initial inspection and testing of electrical installations. If the testijg and testing reveal that parts o ; the installation require urgent attention, it would be appropriate to state an earlier re-inspection date, having due regard to the degree of urgency anc extent of the necessary remedial work.

Gn3 inspection and testing:

When the maximt im vali le declared by the distribi itor is used, the effectiveness of the earth must be confirmed by a test. Date of last inspection: Each supporting part is provided w i t h a flexible base ensuring, w h e n loaded, close contact with the surface being tested ever an area of approximately 9 0 0 inspecion m 2 and having a combined resistance of less than g3 0 0 0 il b e t w e e n t h e terminal and t h e conductive rubber pads.

Page I of Guidance Note 3: When making out and signing a form on behalf of a company or other business entity, individuals should state for w h o m they are acting.

A signatory authorized to certify more t i a n one category of work should sign in testibg of the appropriate places.

The signatures appended are those of the persons authorized by the companies executing the work of ins;ection, construction and inspection and testing respectively. Examples include the addition ot a socketoutlet or a light ng point to an existing circuit, the relocation of a light switch etc.

All simultaneously accessible exposed conductive parts and extraneous conductive parts should be interconnected by equipotential bonding conductors. Where designers are responsible for identifiably separate parts of an installation, the use of separate forms would be appropriate. Hz kA Rated current A d. Last edited by a tesfing I need some help in deciding which books to buy. Connection to the temporary spikes is made as shown in Figure 2.

Rccuircments for the enclosure of and accessibility of connections must be considered. Where testing does not require the equpment or part of an installation to be live, it should be made deac and safely isolated.

This inspection has been carried out in accordance with BS The time interval recommended before the first periodic inspection must be inserted see IEE Guidance Note 3 for guidance.

Inspection and Testing

Hn3 installation certificates, minor electrical works certificates and periodic inspection reports would constitute relevant information in relation to this requirement.

Users found this page by searching for: This recommends the use of fused lest leadb aimed primarily at reducing the risks associated with arcing under fault conditions. The new Institution is the inheritor of the IEE brand and all its products and services, such as this one, which we hope you will find usefu. BS requires that each sealing arrangement be inspected to verify that it conforms to the manufacturer’s erection nstructions. Materials Division Inspection, Testing and Certification A similar requirement can be found in the Housing Scotland ActSection 13 The repairing standard sub-section l c and Section 14 I andlord’s duty to repair and maintain.

A warning notice complying with